| Name of employer | Name, location and type of project and STP Capacity | Name of (consulting) engineer responsible for supervision | Process | Years of Operation & Maintenance | Commissioning Date |
|---|---|---|---|---|---|
| Abu Dhabi Future Energy Company | Masdar Development Waste Water Treatment Facilities - 500 m3/day (3 modules) | CH2M Hill | MBR SYSTEM | 2 years | Under Construction |
| Tecom Investments | Knowledge Village Universities 5,000 m3/day | AAW Consulting Engineers | SBR Technology | 5 years | Under Construction |
| Tecom Investments | Knowledge Village Universities 1,800 m3/day | AAW Consulting Engineers | SBR Technology | 5 years | Under Construction |
| Tecom Investments | Dubai Studio City 1,300 m3/day | AAW Consulting Engineers | MBR SYSTEM | 5 years | Under Construction |
| Tecom Investments | Dubai Bio Technology 2,000 m3/day | AAW Consulting Engineers | MBR SYSTEM | 5 years | Under Construction |
| Tecom Investments | Int’l Media Prod’n Zone 4,000 m3/day | AAW Consulting Engineers | MBR SYSTEM | 5 years | Under Construction |
| Dubai Properties | Al Quoz Land Development, STP – Phase 2 / PE087-7,500 m3/day | Al Khawajah Consultancy | MBR SYSTEM with RO POLISHING SYSTEM | 3 years | Under Construction |
| Dubai Properties | 558 Villas & 258 Villas / P-113 1540 m3/day | AAW Consulting | SBR TECHNOLOGY | 3 years | Under Construction |
| Dubai Properties | The Villa at Dubai Land / P-117 1500 m3/day | AAW Consulting | SBR TECHNOLOGY | 3 years | Under Construction |
| Darwish Engineering / RAK Properties | Mina Al Arab Phase 1 – Infrastructure 6,500 m3/day | Halcrow International Partnership | MBR SYSTEM | 1 year | Under Construction |
| Dubai Sports City - Dubailand | Dubai Sports City , STP 25,000 m3/day, MBR | Clifton Coney Group / Hyder | MBR SYSTEM | 12 years | March 2009 |
| Jebel Ali Free Zone Authority | Temporary STP at JAFZA South Development - 8000 m3/day (BOOT) | Palm Water / GE Infrastructure | MBR SYSTEM | 4 years | October 2008 |
| Nakheel Corporation | Dubai Waterfront, Al Anbar Low Cost Housing Phase I 2,250 m3/day | Cardno International Pty Ltd | MBR SYSTEM | 2 years | May 2008 |
| Dubai Properties | PE087/2 – Al Quoz Land Development – 3,500 m3/day, phase 1 | Meecon Group – Middle East | SBR TECHNOLOGY | 3 years | Feb 2008 |
| Jumeirah International | Upgrade of Sewage Treatment Plant at Oasis Village – 250 m3/day | Jumeirah International | EXTENDED AERATION | 3 years | November 2007 |
| Dubai Industrial City | Temporary Package for Dubai Industrial City, STP 1600 m3/day | EC Harris | SBR TECHNOLOGY | 4 years | October 2007 |
| Dubai Industrial City | Temporary Package for Dubai Industrial City, STP 600 | EC Harris | SBR TECHNOLOGY | 2 years | October 2007 |
| Sharjah Municipality | Al Dhaid Expansion – STP 750 m3/day, MBR System | Sharjah Municipality – Drainage Section | MBR SYSTEM | 2 years Maintenance | October 2007 |
| Union Properties | Dubai Motor City , STP 8,000 m3/day, Completely closed | EDARA / Burt Hill / International / WS Atkins | MBR SYSTEM | 5 yearsStill under EECO operation & maintenance | October 2007 |
| Jebel Ali Free Zone Authority | Temporary STP at JAFZA South Development - 1000 m3/day (BOOT) | Palm Water / GE Infrastructure | MBR SYSTEM | 2 yearsStill under EECO operation & maintenance | 2007 |
| Dubai Ports Authority | (P552FZ) Light Industrial Units – Phase 9 - 70 m3/day | Amana Steel Building Contracting Co. / Al Wasl Al Jadeed Consultants | EXTENDED AERATION | - | - |
| Jebel Ali free Zone Authority | (P578FZ) Free Zone Staff Accommodation, STP – 750m3/day | Civil Engineering Department - JAFZA | EXTENDED AERATION | - | - |
| Sharjah Municipality | Sharjah Central Jail (Punishment & Correction Centre) Rehabilitation of 2 STPs, 500 m3/day | Sharjah Municipality – Drainage Section | EXTENDED AERATION | 2 yearsStill under EECO operation & maintenance | 2006 |
| Dubai Airport FZ Authorities | Dubai Silicon Oasis Sewage Treatment Plant 3,000 m3 / day | Khatib & Alami | EXTENDED AERATION | August 2006 - April 2009 | 2006 |
| Ports, Customs & Free Zone Authority | (P479FZ) Expansion of STP 6 – 4,500 m3/day | Parsons International Ltd. | SBR TECHNOLOGY | - | 2006 |
| Dubai Contracting Company (DCC) | Staff & Labour Accom. At Dubai Investment Park(600 m3/day) | Turnkey | EXTENDED AERATION | 2005 – present, Still under EECO operation & maintenance | 2005 |
| Dubai Municipality | Modification on Aeration System of Al Aweer Central Sewage Treatment Plant | Dubai Municipality / Drainage Department | EXTENDED AERATION | - | 2004 |
| Al Habtoor Engineering | Al Habtoor Labour Camp S.T.P. Capacity 850 m3/day | Apex International Eng. Consultants | EXTENDED AERATION | 2004 – present | 2004 |
| EMAAR Properties | Arabian Ranches Development W.W.T.P. Capacity 6,000 m3/day | Parsons International | EXTENDED AERATION | 6 years - Still under EECO operation & maintenance | 2004 |
| H.E. Dr. Saeed Abdulla | Residential Bldg On Plots 82, 84, 86 & 110-115 - Ajman Sewage Treatment Plant | Rice Perry Ellis | EXTENDED AERATION | 1 year | 2004 |
| Nakheel Corporation | JAP001-A18; Garden Sewage Treatment Plant Additional Expansion 30,000 m3/day with 10 Years operation | Ace International – Phase IIKAME – Phase I | EXTENDED AERATION | 2001 – Phase 1, 2004 – Phase 2, Still under EECO operation & maintenance | 2004 |
| Union Properties | Dubai Autodrome And Business Park - Track & Infrastructure Works (Package 5), STP 180 m3/day | WS Atkins Partners & Overseas | EXTENDED AERATION | 2004-2008 | 2004 |
| Binladin Contracting | Binladin Labour Camp, Sharjah (400 m3/day) | Albaraha Consulting Engineers | EXTENDED AERATION | - | 2004 |
| UAE Armed Forces | MW-OU-106-2003; Operation & Maintenance of Sewage Treatment Plants In Northern Emirates (9 S.T. Plants) | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2003 |
| National Drilling Company | Buhasa Workshop National Drilling Company, STP 25 m3/day | Dewan Architects | EXTENDED AERATION | - | 2003 |
| UAE Armed Forces | Nad Al Sheba Military Camp, STP 400 m3/day | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2003 |
| UAE Armed Forces | MW-AF-207-2001 Volcano Military Camp, STP 200 m3/day | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2003 |
| EMAAR | Emirates Hills-EMAAR Waste Water Treatment Plant 3000 m3/day | Parsons | EXTENDED AERATION | 3 years | 2002-2005 |
| UAE Armed Forces | MW 2118, Urqub Al Theraya Camp, STP 200 m3/day | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2002 |
| Abu Dhabi Company For Onshore Oil Operations (ADCO) | Bab Administration Development, STP 100 m3/day S.T.P. | Engineering Consultants Group (ECG) | EXTENDED AERATION | - | 2002 |
| Abu Dhabi Company For Onshore Oil Operations (ADCO) | Bab 13 Infrastructure, STP 15 m3/day S.T.P. | Engineering Consultants Group (ECG) | EXTENDED AERATION | - | 2002 |
| UAE Armed Forces | MW/2196, Rehabilitation, Operation & Maintenance of Six, STPs | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2001 |
| Abu Dhabi Company For Onshore Oil Operations (ADCO) | Contract No. 5224.01/ EC10487 Construction of Police Camp at Shah 12 m3/day S.T.P. | Engineering Consultants Group (ECG) | EXTENDED AERATION | - | 2001 |
| Abu Dhabi Company For Onshore Oil Operations (ADCO) | Bab infrastructure Development, STP 156 m3/day S.T.P. | Engineering Consultants Group (ECG) | EXTENDED AERATION | - | 2001 |
| UAE Armed Forces | MW/1921 R Royal Guard Regiment at Ras Al Khaimah, STP 200 m3/day | Directorate Of Military Works | EXTENDED AERATION | 2 years | 2001-2005 |
| Bin Fraih Group Of Companies | Bin Fraih Labour Camp, STP 10 m3/day | Turnkey Job | EXTENDED AERATION | - | 2001 |
| Ministry Of Health | Saif Bin Gobash Hospital at Ras Al Khaimah, STP & WTP 150 m3/day | International Engineering Center | EXTENDED AERATION | - | 2000 |
| Dubai International Marine Club | Le Meridian Hotel Al Mina & Seyahi, STP 400 m3/day | Arenco | EXTENDED AERATION | From 1999 – 2009 | 1999 |
| Mr. Abdulla Al Moosa | Hilton Jumeirah Beach Hotel, STP 1200 m3/day & 1 Year Operation | Arenco | EXTENDED AERATION | 2 years | 1999 |
| H.H. Shk. Mohd. Bin Rashid Al Maktoum | Burj Al Arab & Jumeirah Beach Staff Accommodation Phase III & IV , STP 600 m3/day & 1 Year Operation | W.S. Atkins | EXTENDED AERATION | From 1999 - present | 1999 |
| Jebel Ali Free Zone Authority | P185 FZ, New Tenants Labour Camp Phase I (12,000 Person), STP No. 6 | Montgomery Watson | SBR TECHNOLOGY | - | 1998 |
| H.H. Shk. Mohd. Bin Rashid Al Maktoum | Burj Al Arab & Jumeirah Beach, STP No. 5 Staff Accommodation Phase I & II , STP 400 m3/day & 1 Year Operation | W.S. Atkins | EXTENDED AERATION | From 1998 - present | 1998 |
| H.H. Shk. Ahmed Bin Saeed Al Maktoum | Forte Grand Hotel (Royal Le-Merredian), STP 600 m3/day | Arenco | EXTENDED AERATION | 2 years | 1997 |
| Jebel Ali Free Zone Authority | DPA Camp Phase III, STP for 5000 Persons | CED-JAFZA | SBR TECHNOLOGY | - | 1997 |
| Ministry Of Interior | Sharjah Police Training School 250 m3/day | Ministry Of P.W. & Housing | EXTENDED AERATION | From 1997 - 2008 | 1997 |
| Ministry Of Interior | Sharjah Central Jail, STP 250 m3/day | Ministry Of P.W. & Housing | EXTENDED AERATION | 2 years | 1996 |
| Abu Dhabi Municipality | Contract 505/4 Mahawi Military School, STP135 m3/day | Parsons International Ltd. | EXTENDED AERATION | 1 year | 1996 |
| Abu Dhabi Municipality | Ghantoot Hotel Contract No. 413/3, STP 155 m3/day | Dorsch Consult | EXTENDED AERATION | - | 1993 |
| GASCO | GASCO Staff Accommodation At Bab, STP 200 m3/day | John Taylor | EXTENDED AERATION | - | 1993 |
| UAE Armed Forces | Manama Camp Project, STP 50 m3/day | Directorate Of Military Works | EXTENDED AERATION | 2 years | 1992 |
| Dubai Police | Dubai Police Training School, STP 320 m3/day & 4 Years Operation | W.S. Atkins / Dubai Properties | EXTENDED AERATION | 1992 - 2005 | 1992 |
| GASCO | GASCO Staff Accommodation At Asab, STP 200 m3/day | John Taylor | EXTENDED AERATION | - | 1992 |
| UAE Armed Forces | Project EC620, STP 800 m3/day | Directorate Of Military Works | EXTENDED AERATION | - | 1991 |
| UAE Armed Forces | ST EC781 Camp 4, STP 240 m3/day | Directorate Of Military Works | EXTENDED AERATION | - | 1990 |
| UAE Armed Forces | ST EC781 Camp 1, STP 400 m3/day | Directorate Of Military Works | EXTENDED AERATION | - | 1989 |
| UAE Armed Forces | ST EC781 Camp 2, STP 200 m3/day | Directorate Of Military Works | EXTENDED AERATION | - | 1989 |
| UAE Armed Forces | ST EC781 Camp 3, STP 200 m3/day | Directorate Of Military Works | EXTENDED AERATION | - | 1989 |
| Ministry of Health | Sharjah General Hospital, STP 350 m3/day | Public Works | EXTENDED AERATION | - | 1988 |
| I.M.S | Domestic Sewage Treatment plant in Dubai for Mr. Al Fayed, STP 30 m3/day | John Harris | EXTENDED AERATION | - | 1986 |
| Sl. | Client | Consultant | Project Title | Location |
|---|---|---|---|---|
| 1 | SPC, Abu Dhabi Municipality | John Taylor | Sewage pumping station, Contract No.142/11, work order No.44 | Um Al-Nar |
| 2 | SPC, Abu Dhabi Municipality | Dorsch Consult | Sewerage pumping station Contract No.406 | Mussafah |
| 3 | SPC, Abu Dhabi Municipality | Dorsch Consult | 3 nos. Sewerage pumping stations Contract No.406 | Al- Nadha Al-Jadeedah |
| 4 | SPC, Abu Dhabi Municipality | Engineering Science | 2 nos. Ground & storm water pumping stations Contract No.515/1 | Baniyas |
| 5 | SPC, Abu Dhabi Municipality | Hyder Consulting / John Taylor | 3 nos. Sewerage pumping stations Contract No.144/3 | Abu Dhabi Island |
| 6 | SPC, Abu Dhabi Municipality | Engineering Science | 2 nos. Sewerage pumping station R1 & R2 Contract No. 507/2 | Al-Rabah Area |
| 7 | WED -Abu Dhabi, Water Section | Dr. Baflour | 2 nos. water pumping stations Contract No. WED/VWD-540/95 | Marfa |
| 8 | Public Works Department | Public Works Department | 5 nos. Sewerage pumping stations for low cost Houses | Marfa |
| 9 | Public Works Department | Public Works Department | Sewerage pumping station for 60 low cost Houses | Delma Island |
| 10 | Abu Dhabi Municipality | Hyder Consulting Middle East Limited | ADSS Contract No. 148/3, Sewerage works at Mussafah West Sectors | Musaffah, Abu Dhabi |
| 11 | Public Works Department | Public Works Department | Sewerage pumping station for 23 low cost Houses | Delma island |
| 12 | SPC, Abu Dhabi Municipality | Dorsch Consult/ John Taylor | 2 nos., Sewerage pumping stations, Contract No.424/M | Al Wathba Area |
| 13 | Ras Al Khaimah Municipality | Halcrow | Mamoorah Flood Improvement Scheme, Ras Al Khaimah - Pumping station | Ras Al Khaimah |
| 14 | SPC Abu Dhabi | John Taylor | Contract No. 147/3 - Pumping station | Mussaffah |
| 15 | Abu Dhabi Municipality | Hyder Consulting Middle East Limited | ADSS Contract No. 147/7C/M, Mussafah Sewerage Southern Sectors - Phase 3 | Mussafah, Abu Dhabi |
| 16 | Sharjah Municipality | Halcrow International | Al Nahda Foul & Surface Water drainage works (two pumping stations) | Sharjah, Al Nahda |
| 17 | Sharjah Municipality | Halcrow International | University Effluent Reservoir and Trunk Distribution Main Pumping Station - E&M works | Near Sharjah University |
| 18 | Abu Dhabi Municipality | KEO International Limited | Contract No. 304 Western Region Sewerage Project Marfa Sewerage System - Pumping station / Sludge drying beds | Marfa,Abu Dhabi |
| 19 | EMAAR | Parsons Int. Ltd. | Emirates Hills development Infrastructure, Package 4, Contract EH5D | Jebel Ali, Dubai |
| 20 | EMAAR | Ital Consult | Emirates Lakes Neighbourhood 1B,1C,1D | Jebel Ali, Dubai |
| 21 | Abu Dhabi Municipality | Hyder Consulting Middle East | ADSS Contract No. 142/19M Pumping station PS 1/9 - Section E-48, | Mussafah, Abu Dhabi |
| 22 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 514/4M Installation of Flow meters on existing irrigation pipelines, Phase II | Mussafah, Abu Dhabi |
| 23 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 507/4M, Sewerage pumping station for 200 houses at Al Bahya | Mussafah, Abu Dhabi |
| 24 | Abu Dhabi Municipality | Montgomery Watson | ADSS Contract No. 718M Trunk Sewerage for Al Heeliyah, Al Moazaz and Shwameikh East | Mussafah, Abu Dhabi |
| 25 | Abu Dhabi Municipality | De Leuw Cather International Limited | Trip Contract No. 980 Umm Al Nar Bridge & Tunnel Interchange | Mussafah, Abu Dhabi |
| 26 | Abu Dhabi Municipality | De Leuw Cather International Limited | Trip Contract No. 981 Umm Al Nar Bridge & Tunnel Interchange at MIP-3 | Mussafah, Abu Dhabi |
| 27 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 507/6M Sewerage network for Sheikh villas and Al Sadr Prison | Mussafa, Abu Dhabi |
| 28 | Abu Dhabi Municipality | Dorsch Consult | ADSS Contract No. 408M E&M works for RD-22 | Mussafa, Abu Dhabi |
| 29 | Dubai Electricity & Water Authority | Ace International | Mushrif Reservoir Complex Phase II & III | Dubai |
| 30 | Emaar Properties | Hyder Consulting | Emirates Lakes Development - Infrastructure Package 3 (Forat, Zulal & Hattan) | Dubai |
| 31 | Sharjah Municipality | Halcrow | Contract R176-Dualling and new road construction in Kalba Pump station for surface water drainage | Kalba, Sharjah |
| 32 | Jebel Ali Properties | Khatib & Alami | The Garden Hillside Development Potable Water tank, Pump & Generator room | Dubai |
| 33 | Emaar | Parson International Ltd. | Emirates Hill Development, Planning Area 2 - Infrastructure works | Dubai |
| 34 | Sharjah Municipality Drainage Section | Halcrow | Al Taawon proposed Foul Sewer, pumping station, Pumping Main to P.S. 3 in Industrial Area No. 1, Sharjah | Sharjah |
| 35 | Jebel Ali Properties | Parsons International | Jumeirah Island (Al Nakheel Resort) Vacuum Sewer System, Package 9 | Dubai |
| 36 | Ministry of Public Works & Housing | Al Turath Engineering Consultants | Storm Water Network for Al Hamidiya Junction, Ajman | Ajman |
| 37 | Emaar | Parsons International | Dubai Marina Development Phase 1 & 2 Landscape and Irrigation works - Package 3L | Dubai |
| 38 | Emaar | Hyder Consult | Dubai Marina Land Development Package 3D Sewage Pumping Station | Dubai |
| 39 | Emaar | Parsons International Limited | Emirates Hills Development Meadows - Phase 3 Infrastructure | Dubai |
| 40 | Emaar | Parsons International Limited | Arabian Ranches Development - Residential Vilas Phase 1 Infrastructure works | Dubai |
| 41 | Directorate of Military Works | Directorate of Military Works | Contract MW-OU-399-2002 Repair and Maintenance of Water Network at Al Falah Military camp | Sharjah |
| 42 | Dubai Health Care | Dubai | Dubai Health Care City E&M Works for P.S. | Consult |
| 43 | Emaar | Hyder Consult | Dubai Marina Land Development Package 3D Irrigation PS | Dubai |
| 44 | Sharjah Municipality | Halcrow International | Al Azra Area Foul Drainage Sewage Pumping Station | Sharjah |
| 45 | Sharjah Municipality | Halcrow International | Sewage Pumping Station 1A. | Sharjah |
| 46 | Civil Defense | Bel-Yoahah Architectural & Eng. | Training School at Al Awir On Plot No. B-258 (800956) | Dubai |
| 47 | Abu Dhabi Municipality | KEO International | Conference Palace Hotel Project External Works–Package BP–14A & B | Corniche, Abu Dhabi |
| 48 | Abu Dhabi Municipality | KEO International | ADSS Contract No. 311, M&E Works for Laboratory Building at Marfa STP | Marfa, Abu Dhabi |
| 49 | Abu Dhabi Municipality | Montgomery Watson | ADSS Contract No. 716, Mussafah East Master Plan, Main PS -17 | Shawamekh, Abu Dhabi |
| 50 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 2015A & 2016, New Corniche Road East (Stage 2) Road Works and Landscaping | Corniche, Abu Dhabi |
| 51 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 982, Bridge Interchange on the Truck Road in Musaffah Area at MIP-76 | Mussafah, Abu Dhabi |
| 52 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 2002, Widening & Improvement of West Road IP-135 to Mussafah Bridge | Mussafah, Abu Dhabi |
| 53 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 222, New Airport Road and Al Ain Road Interchange Additional Structures & Ramps | Mussafah, Abu Dhabi |
| 54 | Abu Dhabi Municipality | Hyder Consult | ADSS Contract No. 142/20, Misc. Urgent Works–Phase 17 | Mussafah, Abu Dhabi |
| 55 | Abu Dhabi Municipality | Hyder Consult | ADSS Contract No. 142/21, Misc. Urgent Works–Phase 18 | Mussafah, Abu Dhabi |
| 56 | Abu Dhabi Municipality | KEO International | ADSS Contract No. 315D, M&E Works for Package Biofilter System at Sir Baniyas Island | Sir Baniyas, Abu Dhabi |
| 57 | Abu Dhabi Municipality | KEO International | ADSS Contract No. 314A, Miscellaneous Sewer Works at Western Region - Marfa | Marfa, Abu Dhabi |
| 58 | Abu Dhabi Municipality | Hyder Consult | ADSS Contract No. 186/3, Supply & Installation of A.C Systems at PS | Mussafah, Abu Dhabi |
| 59 | Abu Dhabi Municipality | Hyder Consult | Supplemental Works SW-05 Utility Relcoation works for Plot No. 104 in Sector E16/02 | Mussafah, Abu Dhabi |
| 60 | Abu Dhabi Municipality | Parsons International | ADSS Contract No. 509/6, Lowering of Ground Water Table in Al-Ajab and Al Semeih Farms – Phase 1 | Mussafah Abu Dhabi |
| 61 | Abu Dhabi Municipality | Parsons International | ADSS Contract No. 509/7, Lowering of Ground Water Table in Al-Ajban and Al Semieh Farms – P2 | Mussafah Abu Dhabi |
| 62 | Abu Dhabi Municipality | Hyder Consult | ADSS Contract No. 185/6, Temporary Pumps at Khalifa Park & Flow Meter in the Treatment Plant at Mafraq | Mafraq, Abu Dhabi |
| 63 | Abu Dhabi Municipality | Hyder Consult | ADSS Contract No. 142/23, Mechanical & Electrical Works at PS 3/26 | Mussafah Abu Dhabi |
| 64 | Abu Dhabi Municipality | Parsons International | ADSS Contract No. 190/7M, Flow Metering Equipment in Sewers and Irrigation Lines in Abu Dhabi Island and Mainland – Phase 3 | Abu Dhabi |
| 65 | Abu Dhabi Municipality | KEO International | ADSS Contract No. 350, Rehabilitation of Irrigation Reservoir in Western Region Water Supply Audit-Ghayathi | Ghayathi |
| 66 | Abu Dhabi Municipality | Parsons International | ADSS Contract No. 505/5, Sewerage Connection 322 Villas at Al Dhafra Airbase Area | Abu Dhabi |
| 67 | Abu Dhabi Municipality | Dorsch Consult | ADSS Contract No. 445, Surface Water Drainage at Raha Beach | Abu Dhabi |
| 68 | Dubai Festival City | Cansult | Dubai Festival City – Z16P200 – Roads and Infrastructure | Dubai |
| 69 | Sharjah Municipality Drainage Section | Sharjah Municipality Drainage Section | Effluent pumping station and Reservoir at Al Qaraien Area | Sharjah |
| 70 | NAKHEEL | DAR AL HANDASAH | Jumeirah Village South II | Dubai |
| 71 | Abu Dhabi Municipality | Hyder Consult | Const. and Maintenance of Connecting Bridge Between the Islands of Abu al Shaouum and Abu Dhabi – Contract No. 318/A and Additional Works | Abu Dhabi |
| 72 | ADSSC | ACE International | Contract No. 830 (Abu Dhabi University) | Abu Dhabi |
| 73 | Dubai Electricity & Water Authority | Conin | CW/049/2005, Construction of Phase I & Phase II Pumping station with surge vessel and associated E&M works | Dubai/Hatta |
| 74 | Advance Projects Development | Dorsch Consult | Salt Water Intake & Associated Works at PVD Salt Factory – Contract No. 0444/1 | Mussafah |
| 77 | Emaar | Hyder Consulting Middle East Limited | Infrastructure for the Lakes Development Sanam – Phase 1, Site instruction SL-01-Golf Course Sewerage Diversions | Mussafah |
| 78 | Tabreed | Cassia | Tabreed Cooling Plant at Sheikh Zayed Road, Dubai RFT No. 017010-C-2001-Civil, Architectural and Building Services | Dubai |
| 79 | Public Garden Directorate | Montgomery Watson | Ground Water Lowering at Al Shawamekh and Sweihan Interchange Storm Water System, Contract No. 732 | Mussafah |
| 80 | The Committee for Residential Development | Parsons International | Site Grading Infrastructure Work Western Region Development Program Zayed City Subdivision – Contract No. C100 | Madina Zayed City |
| 81 | Sorouh | Hill International | Temporary Water System, Al Reem Island | Al Reem Island |
| 82 | Sorouh | Hyder Consulting | Shams Abu Dhabi Project in Reem Island Construction of Road & Utilities – M&E Works, Contract No. SHM-04R-RDS-C-00 | Shams Abu Dhabi |
| 83 | Sorouh | Reem Developers | Road and Utilities Works for Najmat Abu Dhabi at Al Reem Island – M&E Works | Najmat Abu Dhabi |
| 84 | Tabreed | Cassia | Tabreed Cooling Plant at Al Rashidiya-Civil, Architectural and Building Services | Dubai |
| 85 | Tabreed | Cassia | Tabreed Cooling Plant at Al Kiffaf-Civil, Architectural and Building Services | Dubai |
| 86 | ADSSC | Parsons International | ADSSC Contract No. O-1044, Sewerage and Surface Drainage Works – M&E | Abu Dhabi |
| 87 | Al Dar | Halcrow | Yas Island Development – Construction of Potable Water Tank | YAS Island |
| 88 | TDIC | Parsons International | Saadiyat Island, Contract No. 2569 – M&E Works | Saadiyat Island |
| 89 | Abu Dhabi Municipality | De Leuw Cather International | Trip Contract No. 5001, Brdige & Tunnels at IP-44 and the Sea Palace Intersection, Al Salam Street | Abu Dhabi |
| 90 | Reem Developers | Hyder Consulting | Najmat Abu Dhabi on Reem Island Development, Sewage Pumping Station 1N, 2N, 3N & Irrigation Reservoir | Abu dhabi |
| 91 | Abu Dhabi Municipality | De Leuw Cather International | Contract No. 3/1/180/1-2, Contract 2 (Interchanges at IP-111 & IP-111A) | Abu Dhabi |
| 92 | Sorouh | Hyder Consulting | Shams Abu Dhabi Project on Reem Island, Canal Feed Pumping Stations A1, A2 & A3 | Abu Dhabi |
| 93 | Al Dar | Halcrow | Infrastructure Works Package 2B, Contract No. 1, Yas Island Development (Water Structures & Underpass) | YAS Island |
| 94 | Reem Developers | Parsons International | Al Reem Island Development, Regional Roads and Utilities Infrastructure – Package 1, Electromechanical Works for Irrigation Works & Pumping Station | Al Reem Island |
| 95 | Rawdhat Developers | Hyder Consulting | Infrastructure Works for Rawdhat Development in Abu Dhabi, Electromechanical Works for Irrigation Works | Rawdhat |
| 96 | The Committee for Residential Development | Parsons International | Contract No. G100, Western Region Development Program – Ghayathi City Subdivision project-Site Grading and Infrastructure Work | Ghayathi City |
| 97 | ADSSC | Dorsch Consult | Contract No. O-1185, Construction of Sewerage Connections and Related Works for Isolated Property in Abu Dhabi Island and Mainland - Phase 1 | Abu Dhabi |
| Sl | Description of project | Consultant | Client | Main |
|---|---|---|---|---|
| 1 | "Contract MW-OU-393-2005, Electrical & Water Supply Connection Works for Al Sadr Port Check Point for Coast Guards Group, which included the following
- Supply and laying of various size of LV Cables - Supply, installation, testing and commissioning of transformers and feeder pillars - Supply, installation, testing and commissioning of potable water system " | Directorate of Military Works | Directorate of Military Works | Eagle Electromechanical |
| 2 | Contract MW-RG-166-2006, Football Field Lighting at NAD Al-Shiba Camp | Directorate of Military Works | Directorate of Military Works | Eagle Electromechanical Co. |
| 3 | "Site Grading Infrastructure Work Western Region Development Program Zayed City Subdivision – Contract No. C100 Scope of Work: - Supply, installation, Testing, Commissioning of 24 Nos. 11kV Substations including M.V Switchgears, L.V Panels, Transformers, 48V DC Systems, Feeder Pillars…etc. - Supply and laying of 62 km MV & LV Cables - Supply and installation of various street lightings Poles " | Parsons International | The Committee for Residential Development | Nael Bin Harmal |
| 4 | Al Reem Island Development – Regional Roads and Utilities Infrastructure – Enabling Works – Temporary Roads Package Tender No. BAK-LOG-03-100-007 (173 Nos. of Street Lighting Poles) | Hyder consulting Engineers | Bayt Al Khidma Properties LLC | Nael & Bin Harmal |
| 5 | "Contract No. G100, Western Region Development Program – Ghayathi City Subdivision project-Site Grading and Infrastructure Work Scope of Work: - Supply, installation, Testing, Commissioning of 42 Nos. 11kV Substations including M.V Switchgears, L.V Panels, Transformers, 48V DC Systems, Feeder Pillars…etc. - Supply and laying of 116 km MV & LV Cables - Supply and installation of various street lightings Poles " | Parsons International | The Committee for Residential Development | ASTRACO |
| 6 | Shms Abu Dhabi Project on Reem Island Construction of Earth Work and Deep Sewer (143 Nos. Street Lighting Poles) | Hill International | Sorouh | ADMAC |
| 7 | The Golf Garden – Abu Dhabi, Early Site Package Work (11 kV Cabling) | Hill International | Sorouh | ADMAC |
| 8 | Dubai Industrial City – TBN001 Labour Cities 2&3 (Infrastructure) (340 Nos. Street Lighting Poles, Area Lighting and 11 KV & LV Distribution Network) | ACE International | Tatweer | Nael & Bin Harmal |
| 9 | Infrastructure Works Package 2B, Contract No. 1, Yas island Development (607 nos. Street Lighting Poles) | Halcrow | Al Dar Properties | Nael & Bin Harmal |
| 10 | "Contract No. 45B, Sheikh Zayed Bin sultan Al Nahyan Mosque (Phase 2) - External Works - Landscape, which included the following - Supply and laying of various size of LV Cables - Supply, installation, testing and commissioning of Transformers, RMU, MDB, SMDB, LSFP, LCC - Supply, installation, testing and commissioning of Helipad Lighting System " | Parsons International Limited | Department of Municipalities & Agriculture | Eagle Electromechanical |
| 11 | "Rawdhat Development – Infrastructure Package - Supply, Installation, testing and commissioning of Street Lighting Works (215 Nos.) - Supply, installation, testing and commissioning of 11KV Swtichgear, Transformers, 11KV LV Distribution Board, 48V DC Systems, Feeder Pillar, LCC, LDB, Service Turret - Supply and laying of various size of LV Cables" | Hyder Consulting | Reem Developers | National Projects Committee |
| 12 | " Infrastructure Works Package 2B, Contract No. 1, Yas island Development (Bridges & Underpass) - Supply, installation, testing and commissioning of Street Lighting Works (350 Nos. and necessary works to complete " | Halcrow | Al Dar Properties | Nael & Bin Harmal |
| 13 | "Saadiyat Island Expressway, Project No. C2569 - Rectification & Installation of Lighting and Wiring to Gantry Lighting " | Parsons International Limited | TDIC | Leighton Contracting |
| SlNo | Project Title / Description | Client | Location | Completion Year |
|---|---|---|---|---|
| 1 | Supply, installation of water pipe work for Lissali Tank | Dubai Electricity & Water Authority | Dubai | 1990 |
| 2 | Sully, installation for water pipework for Hatta Tank/chlorination | Dubai Electricity & Water Authority | Dubai | 1993 |
| 3 | R.O. System | White Cement Factory | Ras Al Khaimah | 1988 |
| 4 | Tertiary Filtration system | Khorfakkan Hospital | Sharjah | 1989 |
| 5 | Water softening equipment 403/hr | National Refreshment Co. | Sharjah | 1991 |
| 6 | Ultra-violet sterilizing system 20 m3/hr | Union Beverage | Sharjah | 1991 |
| 7 | Design, supply and supervision of testing and commissioning of Ozone generator capacity 60 gm/hr | Union Beverage | Sharjah | 1991 |
| 8 | Design, supply, installation of water treatment and swimming pool | I.M.S. (Mohd. Al Fayed) | Sharjah | 1992 |
| 9 | Supply of Ozone generator capacity 18 gm/hr | Private Water Bottling Plant | Sharjah | 1992 |
| 10 | Water filtration system - 35 m3/hr | Al Bab International | Abu Dhabi | 1993 |
| 11 | Water filtration system - 25 m3/hr | Al Bab International | Abu Dhabi | 1993 |
| 12 | Water filtration system - 20 m3/hr | Al Bab International | Abu Dhabi | 1993 |
| 13 | Two Reverse Osmosis units, Seawater, complete with treatment and post- treatment. Capacity : 40000 gpd | National Avian Research Centre Abu Dhabi Government | Abu Dhabi | 1993 |
| 14 | 150 m3/day Brackish water desalination plant | Public Works Dept. (A.D) Sharjah General Hospital | Sharjah | 1994 |
| 15 | 2 Nos. Ground & storm water pumping station Contract 515/1 | SPC, Abu Dhabi Municipality | Abu Dhabi | 1996 |
| 16 | 3 Nos. Sewage pumping station Contract 144/3 | SPC, Abu Dhabi Municipality | Abu Dhabi | 1996 |
| 17 | Water filtration and softening system of capacity 50 m3/hr. | Marine International Hotel, Dubai | Dubai | 1997 |
| 18 | 2 Nos. Water pumping stations Contract WED/VWD-540-95 | W.E Department. Abu Dhabi Water Section | Abu Dhabi | 1996 |
| 19 | Sharjah American University Effluent Reservoir and Trunk Distribution Main pumping station | Sharjah Municipality | Sharjah | 2001 |
| 20 | Water filtration & softening system (60 m3/hr) | Seif Bin Gobash Hospital, R.A.K | Ras Al Khaimah | 2001 |
| 21 | R.O. System for kidney dialysis | Seif Bin Gobash Hospital, R.A.K | Ras Al Khaimah | 2001 |
| 22 | ADSS Contract No. 514/M Installation of flow meters on existing irrigation pipelines, Phase II | Abu Dhabi Municipality | Abu Dhabi | 2002 |
| 23 | R.O. Plant for drinking water (50000 gallon) | Al Narjan Oil Field, Buhasa, Abu Dhabi | Abu Dhabi | 2001 |
| 24 | Contract MW-OU-300-2001 Containerzied water treatment plants at Thoban and Manama Military Camps | GHQ Armed Forces Directorate of Military Works Abu Dhabi | Abu Dhabi | 2002 |
| 25 | The Garden Hillside Development Potable water tank, Pump & Generator room | Jebel Ali Properties | Dubai | 2002 |
| 26 | Mushrif Reservoir Complex Phase II & II | Dubai Electricity & Water Authority | Dubai | 2004 |
| 27 | Arabian Ranches Development | Emaar Properties | Dubai | 2006 |
| 28 | Storm water tank & Irrigation tank for the development & construction of Nad Al Sheba Race course on Parcel ID600-8138 | Meydan LLC | Dubai | 2010 |
| 29 | CW/205/2009 Supply, installation, testing and commissioning of motorized butterfly valves, flow meters and associated works | DEWA | Dubai | Under construction |
| 30 | CW/308E/2008 Supply, Installation of glass reinforced epoxy water pipe lines and associated works | DEWA | Dubai | Under construction |
| 31 | CW/0416/2010 Construction of 3.5 MIGD capacity pumping station for Lusaily new camel race city Lusaily camel souk and associated electromechanical works | DEWA | Dubai | Under construction |
| 32 | CW/0129/2010 Al Ghafat Reservoirs Phase 1 & 2 (120 MIG) at Dubai | DEWA | Dubai | Under construction |
| SlNo | Client | Consultant | Project Title | Location | Completion year |
|---|---|---|---|---|---|
| 1 | SPC, Abu Dhabi Municipality | John Taylor | Sewage pumping station, Contract No.142/11, work order No.44 | Um Al –Nar | 1994 |
| 2 | SPC, Abu Dhabi Municipality | Dorsch Consult | Sewerage pumping station Contract No.406 | Mussafah | 1995 |
| 3 | SPC, Abu Dhabi Municipality | Dorsch Consult | 3 nos. Sewerage pumping stations Contract No.406 | Al- Nadha Al-Jadeedah | 1996 |
| 4 | SPC, Abu Dhabi Municipality | Engineering Science | 2 nos. Ground & storm water pumping stations Contract No.515/1 | Baniyas | 1996 |
| 5 | SPC, Abu Dhabi Municipality | Hyder Consulting / John Taylor | 3 nos. Sewerage pumping stations Contract No.144/3 | Abu Dhabi Island | 1999 |
| 6 | SPC, Abu Dhabi Municipality | Engineering Science | 2 nos. Sewerage pumping station R1 & R2 Contract No. 507/2 | Al – Rabah Area | 1999 |
| 7 | Water & Electricity Department - Abu Dhabi, Water Section | Dr. Baflour | 2 nos. water pumping stations Contract No. WED/VWD-540/95 | Marfa | 1999 |
| 8 | Public Works Department | Public Works Department | 5 nos. Sewerage pumping stations for low cost Houses | Marfa | 1994 |
| 9 | Public Works Department | Public Works Department | Sewerage pumping station for 60 low cost Houses | Delma Island | 1998 |
| 10 | Abu Dhabi Municipality | Hyder Consulting Middle East Limited | ADSS Contract No. 148/3, Sewerage works at Mussafah West Sectors | Musaffah, Abu Dhabi | 1998 |
| 11 | Public Works Department | Public Works Department | Sewerage pumping station for 23 low cost Houses | Delma island | 1997 |
| 12 | SPC, Abu Dhabi Municipality | Dorsch Consult John Taylor | 2 nos., Sewerage pumping stations, Contract No.424/M | Al Wathba Area | 1999 |
| 13 | Ras Al Khaimah Municipality | Halcrow | Mamoorah Flood Improvement Scheme, Ras Al Khaimah - Pumping station | Ras Al Khaimah | 1998 |
| 14 | SPC Abu Dhabi | John Taylor | Contract No. 147/3 - Pumping station | Mussaffah | 1999 |
| 15 | Abu Dhabi Municipality | Hyder Consulting Middle East Limited | ADSS Contract No. 147/7C/M, Mussafah Sewerage Southern Sectors - Phase 3 | Mussafah, Abu Dhabi | 2000 |
| 16 | Sharjah Municipality | Halcrow International | Al Nahda Foul & Surface Water drainage works ( two pumping stations) | Sharjah, Al Nahda | 2001 |
| 17 | Sharjah Municipality | Halcrow International | University Effluent Reservoir and Trunk Distribution Main Pumping Station - E&M works | Near Sharjah University | 2001 |
| 18 | Abu Dhabi Municipality | KEO International Limited | Contract No. 304 Western Region Sewerage Project Marfa Sewerage System - Pumping station / Sludge drying beds | Marfa, Abu Dhabi | 2001 |
| 19 | EMAAR | Parsons Int. Ltd. | Emirates Hills development Infrastructure, Package 4, Contract ED5D | Jebel Ali, Dubai | 2002 |
| 20 | EMAAR | Ital Consult | Emirates Lakes Neighbourhood 1B, 1C, 1D | Jebel Ali, Dubai | 2002 |
| 21 | Abu Dhabi Municipality | Hyder Consulting Middle East | ADSS Contract No. 142/19M Pumping station PS 1/9 - Section E-48, | Mussafah, Abu Dhabi | 2002 |
| 22 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 514/4M Installation of Flow meters on existing irrigation pipelines, Phase II | Mussafa, Abu Dhabi | 2002 |
| 23 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 507/4M, Sewerage pumping station for 200 houses at Al Bahya | Mussafa, Abu Dhabi | 2002 |
| 24 | Abu Dhabi Municipality | Montgomery Watsons | ADSS Contract No. 718M Trunk Sewerage for Al Heeliyah, Al Moazaz and Shwameikh East | Mussafa, Abu Dhabi | 2002 |
| 25 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 980 Umm Al Nar Bridge & Tunnel Interchange | Mussafa, Abu Dhabi | 2002 |
| 26 | Abu Dhabi Municipality | De Leuw. Cather International Limited | Trip Contract No. 981 Umm Al Nar Bridge & Tunnel Interchange at MIP-3 | Mussafa, Abu Dhabi | 2002 |
| 27 | Abu Dhabi Municipality | Parsons International Limited | ADSS Contract No. 507/6M Sewerage network for Sheikh villas and Al Sadr Prison | Mussafa, Abu Dhabi | 2003 |
| 28 | Abu Dhabi Municipality | Dorsch Consult | ADSS Contract No. 408M E&M works for RD-22 | Mussafa, Abu Dhabi | 2002 |
| 29 | Dubai Electricity & Water Authority | Ace International | Mushrif Reservoir Complex Phase II & III | Dubai | 2004 |
| 30 | Emaar Properties | Hyder Consulting | Emirates Lakes Development - Infrastructure Package 3 (Forat, Zulal & Harran) | Dubai | 2002 |
| 31 | Sharjah Municipality | Halcrow | Contract R176-Dualling and new road construction in Kalba Pump station for surface water drainage | Kalba, Sharjah | 2002 |
| 32 | Jebel Ali Properties | Khatib & Alami | The Garden Hillside Development Potable Water tank, Pump & Generator room | Dubai | 2003 |
| 33 | Emaar | Parson International Ltd. | Emirates Hill Development, Planning Area 2 - Infrastructure works | Dubai | 2003 |
| 34 | Sharjah Municipality Drainage Section | Halcrow | Al Taawon proposed Foul Sewer, pumping station, Pumping Main to P.S. 3 in Industrial Area No. 1, Sharjah | Sharjah | 2003 |
| 35 | Jebel Ali Properties | Parsons International | Jumeirah Island (Al Nakheel Resort) Vacuum Sewer System, Package 9 | Dubai | 2005 |
| 36 | Ministry of Public Works & Housing | Al Turath Engineering Consultants | Storm water network for Al Hamidiya Junction, Ajman | Ajman | 2003 |
| 37 | Emaar | Parsons International | Dubai Marina Development Phase 1 & 2 Landscape and Irrigation works - Package 3L | Dubai | 2004 |
| 38 | Emaar | Hyder Consult | Dubai Marina Land Development Package 3D | Dubai | 2005 |
| 39 | Emaar | Parsons International Limited | Emirates Hills Development Meadows – Phase 3 Infrastructure | Dubai | 2004 |
| 40 | Directorate of Military Works | Directorate of Military Works | Contract MW-OU-399-2002 Repair and Maintenance of water network at Al Falah Military camp | Sharjah | 2004 |
| 41 | Dubai Health Care City | Cansult | Dubai Health care city – Roads & Infrastructure | Dubai | 2005 |
| 42 | Jebel Ali Free Zone Authority | Khatib & Alami | (P387FZ) Custom Bonded Truck Parking Facility | Dubai | 2005 |
| 43 | Emaar | Hyder Consulting Middle East | Dubai Marina Phase 1 – Package 3D Irrigation pumping station | Dubai | 2005 |
| 44 | Sharjah Municipality | Halcrow International | Al Azra Area Foul Drainage Sewage P.S | Sharjah | 2006 |
| 45 | Sharjah Municipality | Halcrow International | Sewage Pumping Station 1a | Sharjah | 2007 |
| 46 | Civil Defence | Bel-Yohah Architectural & Eng. | Training School at Al Awir on Plot No. B-258 (800956) | Dubai | 2006 |
| 47 | Dubai Electricity & Water Authority | Conin | CW/049/2005 Construction of Phase I & Phase II Pumping station with surge vessel and associated electromechanical works | Hatta - Madam | 2008 |
| 48 | Dubai Festival City | Cansult | Dubai Festival City – Z16P200 – Roads and Infrastructure | Dubai | 2008 |
| 49 | Sharjah Municipality Drainage Section | Sharjah Municipality Drainage Section | Effluent pumping station and Reservoir at Al Qaraien Area | Sharjah | 2007 |
| 50 | Sharjah Chamber of Commerce & Industry | Halcrow | Sharjah Chamber of Commerce & Industry HQ -Pumping Station | Sharjah | 2007 |
| 51 | SAIF-Zone (Sharjah Free Zone International Airport Free Zone) | Maunsell Consultancy Services Ltd. | Water tank for Male Accommodation | Sharjah | 2007 |
| 54 | RAK Properties | Halcrow | Mina Al Arab Phase 1 – Infrastructure | Ras Al Khaimah | 2009 |
| 55 | Sharjah Municipality | Halcrow | Al Darari Pumping Station No. 8 and Rising Main | Sharjah | 2009 |
| 56 | Sharjah Municipality | Halcorw | Al Mamzar Pumping Station No. 6 and Rising Main | Sharjah | 2009 |
| 57 | Govt. of Sharjah | Halcrow | Sharjah Chamber of Commerce & Industry – Head Quarters Infrastructure (Lift station) | Sharjah | 2008 |
| 58 | Dubai Electricity & Water Authority | MEECON | DEWA Contract CW/419/2005 Construction of Pumping station and associated electro-mechanical works along new Jebel Ali Habab Road | Dubai | 2009 |
| 59 | Dubai Electricity & Water Authority | NJS Consultants | DEWA CW/380/2003 Construction of Water Storage Reservoirs; 60 MG in Jebel Ali | Dubai | 2009 |
| 60 | RTA | Parsons | R924/5 – Beautification of Jumeirah Road, Upgrading & Beautification of 2nd Za’abeel Road | Dubai | 2010 |
| 61 | Sharjah Municipality | Halcrow International Partnership | Al Ramtha Pumping Station No. 7 & Rising Main | Sharjah | 2010 |
| 62 | Sharjah Municipality | -do- | Effluent Pumping station and Underground Reservoir at Al Mamzar | Sharjah | Under hold |
| 63 | Sharjah Municipality | Halcrow | R449 – Roads & Drainage in Khazamia & Al Talaa | Sharjah | Under construction |
| 64 | Sharjah Municipality | Khatib & Alami | R 606, Roads & Drainage in Juraina Area | Sharjah | Under construction |
| 65 | Meydan LLC | TAK | Storm water tank & Irrigation tank for the development & construction of Nad Al Sheba Race course on Parcel ID600-8138 | Dubai | 2010 |
| 66 | Dubai Electricity & Water Authority | Mushrif Reservoir Phases 4,5 & 6 (180 MIG) | Dubai | Under construction | |
| 67 | Dubai Electricity & Water Authority | CW/205/2009 Supply, installation, testing and commissioning of motorized butterfly valves, flow meters, pressure transmitters, RTU’s, Radio communication systems, wok station and associated civil & E&M works | Dubai | Under construction | |
| 68 | Dubai Electricity & Water Authority | NJS Consultants | CW/308E/2008 Supply, installation, testing and commissioning of glass reinforced epoxy water pipe lines and associated works | Dubai | Under construction |
| 69 | Al Hilal Properties | CONSER | Al Hilal City Development | Sharjah | 2011 |
| 70 | Sharjah Municipality | Halcrow International | 3A Pumping station and rising main | Sharjah | 2011 |
| 71 | Dubai Electricity & Water Authority | DEWA | CW/0416/2010 Construction of 3.5 MIGD pumping station for Lusaily | Dubai | Under construction |
| 72 | EMAAR | Parsons | Emirates Hills Development Upgrade of Sewer Pumping station at Zulal | Dubai | Under construction |
| 73 | Sharjah Municipality | WSP | R668 – External works for Sharjah University at Kalba | Kalba, Sharjah | Under construction |
| 74 | Dubai Electricity & Water Authority | CW/0129/2010 Construction of Al Ghafat Reservoirs Phase 1 & 2 (120 MIG) at Dubai | Dubai | Under Construction | |
| Sl No | Project Name | Client | Consultants | Main Contractor | Scope of work | Year of Commi. | Year of completion |
|---|---|---|---|---|---|---|---|
| 1 | Domestic Sewage Treatment plant in Dubai for Mr. All Fayed villa | I.M.S | John Harris | Al Darwish Engineering | STP 30 m3/day | 1985 | 1986 |
| 2 | Sharjah General Hospital | Ministry of Health | Public Works | Eastern Limited | STP 350 m3/day | 1987 | 1988 |
| 3 | STP EC781 camp 1 | G.H.Q | G.H.Q | Dyena Contracting | STP 400 m3/day | 1988 | 1989 |
| 4 | STP EC781 camp 2 | G.H.Q | G.H.Q | Dyena Contracting | STP 200 m3/day | 1988 | 1989 |
| 5 | STP EC781 camp 3 | G.H.Q | G.H.Q | Dyena Contracting | STP 200 m3/day | 1988 | 1989 |
| 6 | STP EC781 camp 4 | G.H.Q | G.H.Q | Dyena Contracting | STP 240 m3/day | 1989 | 1990 |
| 7 | Project EC620 | G.H.Q | Six construct | STP 800 m3/day | 1990 | 1991 | |
| 8 | Manama camp project EC896 | G.H.Q | Al Geco | STP 50 m3/day | 1991 | 1992 | |
| 9 | Dubai Police Training School STP | Dubai Police | W.S Atkins | Ascon | STP 320 m3/day & 4 years operation | 1992 | 1997 |
| 10 | GASCO Staff Accommodation at Asab | GASCO | John Taylor | Arabtec | STP 200 m3/day | 1992 | 1992 |
| 11 | GASCO Staff Accommodation at Bab | GASCO | John Taylor | Arabtec | STP 200 m3/day | 1992 | 1993 |
| 12 | Ghantoot Hotel Contract 413/3 | Abu Dhabi Municipality | Dorsch Consult | Rapco Building | STP 155 m3/day | 1992 | 1993 |
| 13 | Contract 505/4 Mahawi Military School | Abu Dhabi Municipality | Engineering Science | D.E.C | STP 135 m3/day | 1995 | 1996 |
| 14 | Sharjah Central Jail | Ministry of Interior | Ministry of P.W.& Housing | Al Salem Transport & Contracting | STP 250 m3/day & 2 years operation | 1995 | 1996 |
| 15 | Sharjah Police Training School | Ministry of Interior | Ministry of P.W.& Housing | Al Salem Transport & Contracting | STP 250 m3/day & 2 years operation | 1996 | 1997 |
| 16 | Forte Grand Hotel (Royal Le-Merredian) | H.H. Shk. Ahmed Bin Saeed Al Maktoum | Arenco | Bu Haleeba | STP 600 m3/day & 1 year operation | 1996 | 1997 |
| 17 | DPA Camp Phase III | Jebel Ali Free Zone Authority | Montgomery Watson | Arabtec | STP 5000 persons | 1996 | 1997 |
| 18 | Chicago Beach Resort Development - Staff Accommodation Phase I & II Contract 4120 | H.H. Shk. Mohd. Bin Rashid Al Maktoum | W.S. Atkins | Al Rashid | STP 400 m3/day & 1 year operation | 1997 | 1998 |
| 19 | Baku Resort complex, Azerbajan | Improtex Association | Turnkey job | Improtex Contracting | STP 120 m3/day | 1997 | 1997 |
| 20 | P185 FZ, New Tenants Labour camp, Phase I | JAFZA | Montgomery Watson | Al Futtaim Tarmac | STP 2850 m3/day | 1998 | 1998 |
| 21 | Le Meridian HotelAl Mina Al Seyahi | Dubai International Marine Club | Arenco | Al Shafar | STP 400 m3/day & 1 year operation | 1998 | 1999 |
| 22 | Sheraton Jumeirah Hotel | Mr. Abdulla Al Moosa | Arenco | Al Ahmadiah | STP 1200 m3/day with 1 year operation | 1998 | 1999 |
| 23 | Chicago Beach Resort Development - Staff Accommodation Phase III & IV Contract 4120 | H.H. Shk. Mohd. Bin Rashid Al Maktoum | W.S. Atkins | Al Rashid | STP 600 m3/day with 1 year operation | 1999 | 1999 |
| 24 | Saif Bin Gobash Hospital at Ras Al Khaimah | Ministry of Health | International Engineering Centre | Obaidulla Contracting | STP and Water Treatment of 150 m3/day | 2001 | 2000 |
| 25 | Filtration system for STP at Sweihan & Al Hayer | Al Ain Municipality | Balfour and Sons | Al Jouf Contracting | STP 860 m3/day | 2000 | 2000 |
| 26 | Bin Fraih Labour camp | Bin Fraih Group of Companies | STP 10 m3/day | 2001 | 2001 | ||
| 27 | MW/1921R Royal Guards Regiment at Ras Al Khaimah | Directorate of Military Works, Abu Dhabi | Directorate of Military works | Unity Contracting Co. | STP 200 m3/day | 2001 | 2001 |
| 28 | The Gardens - Residential Complext at Jebel Ali Village (JAP001) | Jebel Ali Properties | Khatib & Alami | Binladin Contracting | STP 6000 m3/day with 1 year operation | 2001 | 2001 |
| 29 | Contract No. 5224.01/EC10487 Construction of Police Camp at Shah | ADCO | ADCO | Envirotec | STP 12 m3/day | 2000 | 2000 |
| 30 | Bab Infrastructure Development | ADCO | ADCO | Arabtec | STP 156 m3/day | 2001 | 2001 |
| 31 | Bab Administration Development | ADCO | ADCO | Arabtec | STP 100m3/day | 2001 | 2002 |
| 32 | Bab-13 Infrastructure | ADCO | ADCO | Arabtec | 15 m3/day | 2002 | 2002 |
| 33 | MW/2196, Rehabilation, Operation & maintenance of six sewage treatment plants | Abu Dhabi Government | Directorate of Military Works | Abu Dhabi Government | 6 different STPS | 2001 | 2001 |
| 34 | Umm Dorman Hospital, Khartoum, Sudan | Al Shawahiq Contracting | Turnkey job | Shawahing Eng. Co. | STP 600 m3/day | 2002 | 2002 |
| 35 | Waste Water Treatment Plant | Emaar | Parsons | Al Futtaim Tarmac | STP 3000 m3/day | 2002 | 2002 |
| 36 | MW2118, Urqub Theray Camp | Directorate of Military Works | Dhabi Contracting | STP 200 m3/day | 2001 | 2002 | |
| 37 | Volcano Military Camp | Directorate of Military works | Directorate of Military Works | Emirates Electromechanical & Industry L.L.C, | STP 200 m3/day | 2002 | 2003 |
| 38 | MW2258R Nad Al Shiba Military Camp | Directorate of Military works | Directorate of Military Works | Al Ahmadiah Contg. | STP 400 m3/day | 2003 | 2004 |
| 39 | NDC Contract 10298 Buhasa workshop | National Drilling Co. | Ian Banham & Associates | Hadeed Emiates/ Sea Sands | STP 25 m3/day | 2003 | 2004 |
| 40 | JAP001-A18 Garden STP Expansion | NAKHEEL | Ace Consultant | Eagle Electromechanical Co. | STP 30000 m3/day | 2003 | 2005 |
| 41 | Binladin Labour Camp | Binladin Contracting Group | Binladin Contracting Group | STP 400 m3/day | 2003 | 2004 | |
| 42 | Dubai Autodrome and Business Park – Package 5 – Track and Infrastructure works | Union Properties PJSC | Edara LLC | Al-Futtaim carillion | STP 180 m3/day | 2003 | 2004 |
| 43 | Arabian Ranches Development Waste Water Treatment Plant | Emaar Properties PJSC | Parsons International | Eagle Electromechanical Co. | STP 6000 m3/day | 2004 | 2004 |
| 44 | Residential building at Aj Gurg, Ajman for H.E Dr. Saeed Abdullah Salman | H.E. Dr. Saeed Abdullah Salman | Rice Perry Ellis | Fujairah National Construction Co. | STP 30 m3/day | 2004 | 2004 |
| 45 | Construction of New Staff and Labour Accommodation at Jebel Ali | Al Habtoor Engineering | Apex International | Al Habtoor Engineering | STP 850 m3/day | 2004 | 2004 |
| 46 | Al Aweer STP with Aeration System | Dubai Municipality | 2004 | 2005 | |||
| 47 | (P479FZ) Expansion of STP6 | Ports, Customs & Free Zone Authority | Parsons International Ltd. | Eagle Electromechanical Co. | STP 2,900m3/day | 2006 | |
| 48 | Labour & Staff Accommodation for Dubai Contracting Co. | Dubai Contracting Co, | Dubai Contracting Co. | 500 m3/day | 2005 | ||
| 49 | Engineering works for Dubai Silicon Oasis/(P-010) Infrastructure works (Phase 1) (2005) | Dubai Airport Free Zone Authority | Khatib & Alami | Wade Adams Contracting | 3,000 m3/day | 2005 | 2006 |
| 50 | Dubai Sports City | Dubai Sports City | Hyder Consulting | Eagle Electromechanical Co. | STP 25,000 m3/day | 2006 | 2009 |
| 51 | Dubai Motor City | Union Properties | Al Futtaim carrillion | STP 8,000 m3/day | 2006 | 2008 | |
| 52 | Al Quoz Land Development project (PE-087) | Dubai Properties | Meecon | Eagle Electromechanical Co. | STP 3,500 m3/day | 2006 | 2007 |
| 53 | (P578fz) Free Zone Staff Accommodation | Jebel Ali Free Zone Authority | Civil Engg. Dept., JAFZA | Tawiq Contracting | STP 750 m3/day | 2006 | 2007 |
| 54 | (P552FZ) Light Industrial Units - Phase 9 | JAFZA | Al Wasel Al Jadeed | Amana Steel Building Contg. Co. | 70 m3/day | 2006 | 2007 |
| 55 | Al Dhaid Expansion STP | Sharjah Municipality | Drainage Section | 750 m3/day | 2006 | 2007 | |
| 56 | Dubai Industrial City DI-OPC-CONTRACT-01-07-001 | Dubai Industrial City | MWH | Al Hijaz Mechanical Equipment Co. | STP 1600 m3/day & 600 m3/day | 2006 | 2008 |
| 57 | Temporary STP (DBOOT) at JAFZA South Development | Palm Water | ACE Consultants | Eagle Electromechanical Co. | STP 8000 m3/day | 2007 | 2009 |
| 58 | Temporary STP (DBOOT) at JAFZA South Development | Palm Water | ACE Consultants | Eagle Electromechanical Co. | STP 1000 m3/day | 2007 | -do- |
| 59 | Dubai Waterfront, Al Anbar Low Cost Housing, Phase 1 | Pal Water | Mouchel Parkman | Eagle Electromechanical Co. | STP 2250 m3/day | 2007 | -do- |
| 60 | Mina Al Arab Phase 1 – Infrastructure work | RAK Properties | Halcrow | Darwish Engineering | STP 4350 m3/day | 20007 | -do- |
| 61 | Upgrade of STP at Oasis Village | Jumeirah International | Jumeirah International | Eagle Electromechanical Co. | STP 250 m3/day | 2007 | 2008 |
| 62 | The Villa at Dubai Land P-117 | Dubai Properties | AAW Consulting | Eagle Electromechanical Co. | STP 1500 m3/day | 2008 | 2009 |
| 63 | 558 Villas & 258 Villas P-113 | Dubai Properties | AAW Consulting | Eagle Electromechanical Co. | STP 1540 m3/day | 2008 | 2009 |
| 64 | A Quoz Land Development – Phase II/PE-087 | Dubai Properties | Eagle Electromechanical Co. | STP 4000 m3/day | 2008 | 2008 | |
| 65 | MBR Waste Water Treatment Plant | MASDAR | Eagle Electromechanical Co. | 3 x500 m3/day | 2008 | 2009 | |
| 66 | PT-07 Temporary Sewage Treatment Plant at Dubai Studio City | TECOM | -do- | Al Hijaz Mechanical Equipment Co. | STP 1300 m3/day | 2008 | 2008 |
| 67 | PT-07 Temporary Sewage Treatment Plant at DuBiotech | TECOM | -do- | Al Hijaz Mechanical Equipment Co. | STP 2000 m3/day | 2008 | 2008 |
| 68 | PT-07 Temporary Sewage Treatment Plant at International Media Production Zone | TECOM | -do- | Al Hijaz Mechanical Equipment Co. | STP 4000 m3/day | 2008 | 2008 |
| 69 | PT-07/1 STP at Knowledge Village (DBOM) | TECOM | -do- | Al Hijaz Mechanical Equipment Co. | STP 1800 m3/day | 2008 | 2010 |
| 70 | PT-07/1 STP at Knowledge Village (DBOM) | TECOM | -do- | Al Hijaz Mechanical Equipment Co. | STP 5800 m3/day | 2008 | 2010 |
| 71 | Sweihan Wastewater Treatment Plant Capacity Upgrade and Tanker Discharge Facility in Al Saad, Al Ain | ADSSC | AECOM | Eagle Electromechanical Co. | 2011 | Under construction | |
| 72 | CMW-11085-P001 STP at Fujairah Marine Base | Army HQ | Eagle Electromechanical Co | STP 250 m3/day MBBR | 2011 | Under Construction | |
| 73 | Sabya Package STP | Ministry of Water & Electricity, Saudi Arabia | Saudi Eagle Environmental Engineering LLC | 3 x 500 m3/day MBR | 2011 Just Awarded | Just Awarded | |
| 74 | Waste Water Treatment Plant For Al Ghadeer Phase 1, Abu Dhabi | Sorough Real Estate | Dorsch Consultant | Eagle Electromechanical Co. | 1500 m3/d | 2012 Just Awarded | Just Awarded |
| Sl No | Description of project | Consultant | Client | Main Contractor | Completed |
|---|---|---|---|---|---|
| 1 | Design, supply, installation of plumbing works for 15 villas at Dubai. | Mr. Salim | Pioneer | 1991 | |
| 2 | Supply and installation of plumbing & fire fighting works for G+7F residential building at Dubai. | Moez & Higazi | Mr. Ali Owais | Al Ashram Contg. | 1991 |
| 3 | Supply, installation, testing and commission-ing of plumbing and fire fighting works for G+16F residential building at Sharjah. | W.S. Atkins | Essa Saleh Al | Sun Engineering | 1991 |
| 4 | Supply, installation, testing and commission-ing of plumbing & fire fighting works for G+9F residential building at Sharjah. | Khatib & Alami | Mr. Munir | -do- | 1991 |
| 5 | Supply, installation, testing and commission-ing of plumbing & fire fighting works for G+M+3 typical office building at Dubai. | Adnan Saffarini | Mr. Abdul Jalil Al | Pioneer | 1992 |
| 6 | Supply, installation, testing & commissioning of plumbing and fire fighting works for G+M+3 typical office building at Dubai. | Nutek | Mr. Faraj Bin Buti | Pioneer | 1992 |
| 7 | Design, supply, installation, testing & commissioning of plumbing works for G+7 residential studio apartment at Dubai | Arenco | Mr. Abdulla A. Al Moosa | -do- | 1992 |
| 8 | Supply, installation, testing & commissioning of plumbing and fire fighting works for National Avian Research Centre at Al Ain | Arkan | Abu Dhabi | Dyena Contracting Co. | 1993 |
| 9 | Supply, installation, testing & commissioning of plumbng & fire fighting works for G+7 studio apartment at Dubai. | Arenco | Mr. Abdulla A. | Pioneer | 1993 |
| 10 | 22 Low Cost Houses at Mozerra Masfout | P.W.D., Abu Dhabi | Al Moosa | Team Engineering | 1994 |
| 11 | Aseef School for handicapped for H.H Shaikh Ahamed Al Maktoum at Al safa, Dubai | Ahmed Salem | 1994 | ||
| 12 | G+7F residential building (Golden sands 8) | Arenco | Mr. Abdulla A. | Pioneer | 1994 |
| 13 | G+10F Building at Sharjah | Gulf Consultant | Awqaf | Team Engineering | 1995 |
| 14 | Combined school for boys at Al Shuwaib | P.W.D | P.W.D | Ranya Contracting | 1995 |
| 15 | Reem Villas (17) | S.P.P | Mr.Ahmed Qasim | Dubai Contg. Co. | 1995 |
| 16 | Al Futtaim Workshop at Sharjah | Al Futtaim | Al Futtaim Wimpey | 1995 | |
| 17 | Extension for residential complex for H.H Shaikh Hamdan Bin rashid Service & maid’s block Ext. | Arif & Bin Toak | H.H. Shaikh Hamdan Bin Rashid | Dubai Contracting Co. | 1995 |
| 18 | Industrial shed block, Jebel Ali | Al wasl Al Jadeed | Jebeli Ali Authorities | Pioneer | 1995 |
| 19 | 12 Villas at Jumeirah | Dubarch | Rafee Al Qasim | Ranya Contracting Co. | 1995 |
| 20 | G+3, G+7 Building , supply installation, testing of A/c chilled water work | Shadeed Eng. Consultants | Mohd. Siddiq | Dubai Contg. Co. | 1997 |
| 21 | B+G+7 Building, Dubai | Moez & Higazi | Ali Al Owais | Al Rasheed Contg. | 1997 |
| 22 | Car park for Mr. Salim Abdulla (Al Salam Tower) | W.S. Atkins | Salim Abdulla | Dubai Contg. Co. | 1996 |
| 23 | B+G+M+3 Al Zubair Building, Dubai | Arenco | Mohammed Bin Al Zubair | Al Taamir Contg. Co. | 1997 |
| 24 | 20 Villas at Bidyah | Ministry of Public Works | Ministry of Public Works | Lilley International | 1995 |
| 25 | 20 Villas at Chawka | Rejlers | PWD, Abu Dhabi | Saleh Bin Haider Eng. & Contg. Co. | 1996 |
| 26 | 25 Villas at Gizemri, Farfar & Madou | Rejlers | PWD, Abu Dhabi | Saleh Bin Haider Engg. Contg. Co. | 1997 |
| 27 | 19 Low Cost Houses, Fujairah Electrical & plumbing works | Rejlers | -do- | Al Saleh Contg. & Trading Co. | 1996 |
| 28 | 10 villas at Fujairah, | Ministry of Public Works & Housing Building | Ministry of Public Works & Housing Building | Al Raed Engg & Contracting Co. | 1996 |
| 29 | Al Rostamani Office building, Sharjah | Khatib & Alami | Al Rostamani | Dyena Contg. Co. | 1998 |
| 30 | American University of Sharjah | Gambert | American University | Darwish Engineering | 1998 |
| 31 | G+B+M+15 Storey building for Mr. Muneer Kaloty | Suidan & Associates | Mr. Muneer Kaloty | Sun Engineering & Contracting Co. | 1999 |
| 32 | B+G+M+5 Building | Arif & Bin Toak | Al Bannai | Dubai Contg. Co. | 1998 |
| 33 | G+10 Alami Centre 2, Sharjah | Khatib & Alami | Mr. Alami | Al Rukn Contracting Co. | 1999 |
| 34 | Package 1, Labour Accommodation Jebel Ali | Al Hashemi | Jebel Ali Free Zone Authorities | Al Moosa Contg. Co. (PIONEER) | 1999 |
| 35 | G+7 Al Maha Building, Dubai | Shadeed Eng. Consultants | Mr. Qasim Siddiqi | Dubai Contg. Co. | 1998 |
| 36 | 32 +(1) Villas for H.H. Sheikh Humaid Al Moalla, Dubai | Adnan Saffarini | H.H. Sheikh Humaid Al Moalla | Gulf Interstate Contracting | 1999 |
| 37 | Hamed Sultan Abdulla Al Owais (G+M+10) Typical Bldg. at Sharjah | Khatib & Alami | Hamed Sultan Abdulla Al Owais | Abdel Hadi Engineering & Contracting Co. | 1999 |
| 38 | Private Villa for Mr. A.H. Seddiqi, Dubai | Ian Banham & Associates | A.H. Seddiqi | Dubai Contracting Co. | 1999 |
| 39 | Reem -II 12 Villas, Dubai | Schuster Pechtold and Partners | A.H. Seddiqi | -do- | 1999 |
| 40 | G+29 Storey Building for Mr. Saleh Bhukhater, Sharjah | Khatib & Alami | Mr. Saleh Bhukhater | Sun Engineering & Contg. Co. | 2001 |
| 41 | G+3 Building at Al Ghusais, Sharjah | Arif & Bintoak | Mr. Abdulla Qasim | Gulf Interstate | 2000 |
| 42 | H.H Hamad Bin Jassim Bin Jaber Al Thani Tower, (Doha Tower) Dubai, B+G+M+34 Floors +2 Pent house + Roof + Helipad | Khatib & Alami | H.E. Sh. Hamad Bin Jassem Bin Jaber Al Thani | Sun Engineering & Contracting Co. | 2001 |
| 43 | Al Rafada Military Camp | Ministry of Defence | Darwish Engineering | 2000 | |
| 44 | (B+G+M+2 storey) City Pharmacy Office Building | Khatib & Alami | Mr. Abdul Rahman Ibrahim Mohammed | Future Contracting | 2001 |
| 45 | Nas International Stables | RMJM | Engineer’s Office | Drake & Skull/ Al Moosa Contg. | 2001 |
| 46 | Residential Complex at Jebel Ali Villages - The Gardens Building Package 3 (G+2) 34 Buildings | Khatib & Alami | Jebel Ali Properties | Obaidulla Contg. | 2002 |
| 47 | 100 Villas at Khalifa 釘� Abu Dhabi | Arab Engineering Consultants | Abu Dhabi Works Department | Al Habtoor Engg. Enterprises Co. | 2001 |
| 48 | 85 Villas at Al Samha, Abu Dhabi | International Engineering Consultants | Abu Dhabi Municipality | Al Habtoor Engg. Enterprises Co. | 2002 |
| 49 | 30 Villas at Al Samha, Abu Dhabi | -do- | -do- | Intermass Engg. & Contg. Co. | 2002 |
| 50 | 80 Villas, for H.E. Ali Khalfan Rashid Al Mutawa Al Dhahiri, Umm Suqeim | Ian Banham | H.E. Ali Khalfan Rashid Al Mutawa Al Dhahiri | Ali & Sons | 2003 |
| 51 | Comm. & Resi. Building, G+M+31 Floors (Khalifa Tower) | Space Consult | H.H. Shk. Abdullah Bin Essa Bin Salam | UNEC | 2004 |
| 52 | Planning Area 10 development Construction of (2 Nos.) Type 1 Apartment building, at Jebel Ali, Duabi (Plumbing, A/c & Electrical) | Al Hashemi Architect, Engineers & Planners | Emaar | Obaidulla Contg. | -do- |
| 53 | Planning Area 10 development Construction of (8 Nos.) Type 1 Apartment building, at Jebel Ali, Dubai | Al Hashemi Architect, Engineers & Planners | Emaar | UNEC | 2004 |
| 54 | Project No. JAP005 Jumeirah Islands Development | Diar Consult | Jebel Ali Properties | -do- | |
| 55 | PJ2246 Bus Service Station, Al Awir | W.S Atkins & Partners Overseas | Dubai Municipality | Amana Steel Bldg. Contg. Co. | 2003 |
| 56 | Factory for Sumitomo Tyres Middle East | Al Wasl Al Jadeed Consultant | Shaheen Tyres Est. | Al Andalos Contg. | 2004 |
| 57 | China Town – Chinamax Apartments Package 2 Ref. JAP016/4-2 | ACE International | NAKHEEL | Al Andalos Contg. | 2005 |
| 58 | The Palm Jumeirah Villas JAP006-800 Signature Home Villas & Jap006-450 Canal Cover Town Houses (324 villas) | Schuster Pechtold & Partners | NAKHEEL | Al Moosa Contracting (PIONEER) | 2007 |
| 59 | (P-387 FZ) Dubai Central Fruit & Vegitable Market Building Package at Ras Al Khor Ind-Third, Dubai | Al Gurg Faisal Abdulla Al Gurg | Port Customs & Free Zones Corporation | Al Andalos | 2004 |
| 60 | 2B+G+M+50 Resi./Comm. Al Zarooni Tower at Dubai Marina, Dubai for Mr. Abdul Rahim Mohd. Abdul Rahim Al Zarooni | Artec-Architectural & Engineering Consultant | Al Zarooni Real Estate | Transemirates Contracting | 2007 |
| 61 | JAP006-400 The Palm Jumeirah, Shoreline Apartments Package 2 (6 Buildings) of 10, 11 & 12 Floors | Associated Consulting Engineers (ACE) | NAKHEL | Seidco General Contracting Co. | 2005 |
| 62 | JAP015/4-4 International City Resi./ Commercial Building Package 4 (27 Buildings) | Associated Consulting (ACE) Engineers International | NAKHEEL | Al Sahel Contracting | 2006 |
| 63 | JAP055-02-30/MEP30 Gardens of Discovery – Contemporary Gardens 1 Type W (18 Buildings) – G+5 Floors Type X (9 Buildings) - G+6 Floors | Engineering Consultants Group | Nakheel | Pauling Middle East | 2007 |
| 64 | JAP015/4-10; Proposed International City Residential/Commercial Buildings Package 10 (34 Buildings) | Associated Consulting (ACE) Engineers International | Nakheel | Al Sahel Consulting Engineers International | 2007 |
| 65 | (B+G+18) Carlton Residence , Sharjah | Syna Development | Al Aziziah United Real Estate Invest Co. | Abdelhadi Engineering & Contracting | 2008 |
| 66 | Al Ali Residential Building (B+G+4+Roof on Plot No. 332-130 at Al Dhiyafa Road | Khatib & Alami | H.E Mohammad Abdulrahim Al Ali | Future Contracting | 2006 |
| 67 | JAP055-02-C040 Discovery Gardens – Mogul Gardens – 1 Type “U” (20 Buildings) – G+4 Floors Type “V” (11 Buildings) – G+5 Floors | Engineering Consultants Group | Nakheel | Pauling Middle East | -do- |
| 68 | PJ273, The Palm Jumeirah Villas Construction of 131 Villas at Frond ‘O’ | KEO International Consultant | NAKHEEL | Pauling Middle East | 2007 |
| 69 | Garden & Signature Homes at The Palm Jumierah Villas Frond ‘P’ (28 Signature type villa) | KEO International Consultant | NAKHEEL | Parkway International | 2007 |
| 70 | The Palm Jumeirah Villas on Frond ‘F’ (91 villas) | KEO International Consultant | NAKHEEL | Al Shafar Transport & Contracting | 2007 |
| 71 | Signature Homes at the Palm Jumeirah Villas Frond “A & B” Frond A (18 Nos. villas) Frond B (11 Nos. villas) | Hill International | NAKHEEL | Parkway International | 2007 |
| 72 | Falcon City of wonders development Phase one 366 Villas at Dubai Land | MEECON | Falcon City of Wonders LLC | Pauling Middle East | 2009 |
| 73 | G+4P+HC+1S+26 Typical Floors Resi/Comm. Tower (Sky View Tower) | National Engg. Bureau | Holtville Properties | TAV Construction/ SERA Construction | Under handing over |
| 74 | B+G+1 Villas (43 Nos.) Al Barshaa, Dubai | Altakamul Alhandasi | Mohd. Abdulrahim Mohdammad Al Ali | 2009 | |
| 75 | City CP504 Dubai Maritime Labour Accommodation complex (5 zone) of G+12 Floors | Arenco | Dubai Maritime City / NAKHEEL | Pauling Middle East | 2008 |
| 76 | 3B+G+3P+27 Sami Tower on Plot No. BB-A02-007 at Business Bay, Dubai | Dimensions Engineering Consultants | Alternative Capital Invest (A.C.I) | Saqer Engineering & Contg. Enterprises | Under hold |
| 77 | G+M+31 Typical + HC Hotel Building on Plot No. 1207, Al Khan, Sharjah | Eng. Adnan Saffarini | Ali Abdullah Ali Al Hamrani | Darwish Engineering | Under hold |
| 78 | Proposed Labour Accommodation (G+2) for Mr. Ahmad Bin Eisa Al Serkal | Forth Dimension Engg. Consultancy | Ahmad Bin Eisa Al Serkal | Georgia Contracting Co. | 2010 |
| 79 | Residential buildings @ Dubai land (7 Buildings) G+6 Floors | Eng. Adnan Saffarini | Sondos Real Estate | Al Qandeel | Under construction |
| 80 | Investigation & Drugs Building Al Ain | Dar Al Khaleej | Ministry of Interior Abu Dhabi | Reem Dubai | Under construction |
| 81 | Lakeside Towers on Plot No. M028, M029, M030, M031 & IMPZ Dubai | ZAS/PSE | Damac Properties Co. LLC | Gulf Technical Construction Co. LLC | Under construction |
| 82 | Dubai Lagoon Zone – Lotus block B1, B2, B3, B4, B5, B5, C1 and C+1 Residential Apartments, Dubai | MAZAYA Engineering Consultants | Schon Properties | Commodore Contracting Co. LLC | Under construction |
| 83 | B+G+3 Police Station and G+4 Baracks Block at Plot No. P72, Region 1, Sector E-12, Abu Dhabi | Secure Project Management | Police General Head Quarter, Abu Dhabi | Reem Dubai Contracting LLC | Under construction |
| SlNo | Capacity | Client | Consultant | Description | Year |
|---|---|---|---|---|---|
| 1 | 300 m3/day | G.H.Q | G.H.Q | GHQ Project EC620 - Sweihan, Abu Dhabi Chemical waste treatment plant for chromium, cyanide, heavy metal | 1990 |
| 2 | 240 m3/day | Dubai Municipality | Acer Freeman Fox | PJ1003 Integrated Hazardous Waste Treatment Plant Chemical Treatment plant, Oil Separation plant & Evaporation ponds for all Dubai Emirate | 1999 |
| 3 | 7.5 m3/batch | Dubai Aluminium Company | Tebodin Middle East | Dubai Liquid Waste Treatment Facility for Chemical Neutralization system | 2000 |
| 4 | 300 m3/day | G.H.Q Armed Forces | G.H.Q Armed Forces | Contract No. MW/3085 Operation & Maintenance of Chemical treatment plant for General Maintenance Directorate | 2001 |